SHOPPING CART
Your shopping cart is empty.

Click on image to zoom in
Emergency Lighting Test Switch

£46.07 (ex VAT)






spacer

policy
  (Exceptions and Terms &
           Conditions apply. View.)

Emergency Lighting Test Switch


Emergency lighting test switches provide a cost effective solution to the testing of emergency luminaires. It is a requirement that all emergency luminaires are tested regularly so that an adequate level of illumination is given by the lamps under emergency conditions. This can be achieved by interrupting the supply to the luminaires at the distribution board. Self test fittings are available but these can be costly. Alternatively our Emergency Lighting Test Switch can be used to simplify testing by providing local automatic switching.

Suitable for offices, schools, colleges, industrial and retail.

The ELT10 emergency lighting test switch is designed to test the function of emergency luminaires. A key switch is used to interrupt the supply to the luminaires for a pre-programmed period of time. At the end of the time period the supply to the luminaires is automatically re-instated. The result is that there is no risk of depleting the batteries in the emergency fitting.

Three pre-programmed test intervals are available:
  • 10 minutes.
  • 1 hour.
  • 3 hours.

The unit will power up with the SUPPLY ON lamp illuminated—the supply will be connected to the output. Turn and release the key switch to select the 10 minute test interval. Turn and release again to select the next test interval—the supply will be disconnected
from the output for the duration of the test. To cancel a test, turn and release the keyswitch until the SUPPLY ON lamp illuminates.

Product Specifications:
  • Load
    • 10 Amp incandescent lighting.
    • 6 Amp fluorescent lighting.
    • 3 Amp compact fluorescent lighting.
    • 3 Amp low energy lighting.
    • 3 Amp low voltage lighting (switch primary of transformer).
    • Fluorescent lighting (max 6 fittings recommended).

    • For fluorescent lighting total power factor correction capacitance must not
      exceed 40 F.
  • Supply Voltage: 220-240 Volts AC 50 Hz.
  • Timing Period: 10 minutes, 1 hour, 3 hours.
  • Fixing Method: Surface fixing 25mm deep plastic surface mount moulded box.
  • Flush fixing 25mm steel wall box or 32mm deep cavity wall box.

Model: ELT10





back

 

 

 

Payments powered and secured by
alliance leicester   protx

Contact Us | Vacancies | Site Map | Privacy Notice | Terms and Conditions
Lights/Electrical Old Website | Web Production | Zen-Cart | Resources
Copyright © 2003-2007 SparksDirect